Dale
Power plant · Coal
Key facts
Power plant · Coalran 3% of 2015 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1954
- Net generation, 2015
- 48,329 MWh
- Grid
- 138 kV, 69 kV to East Kentucky Power Coop, Inc (PJM)
- Location
- Clark County, Kentucky
- Operated by
- East Kentucky Power Coop, IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Coal
- Oil
Details
Who’s behind it
- Owner
- East Kentucky Power Coop, IncSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Coal source: “Conventional Steam Coal”
- Age
- 72 years since 1954
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Balancing authority code | PJM |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- April 2016
- First unit retired
- April 2015
- Capacity retired
- 216 MW
- Generators retired
- 4
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Conventional Steam Coal | 27 MW | Retired | April 2015 |
| 2 | Conventional Steam Coal | 27 MW | Retired | April 2015 |
| 3 | Conventional Steam Coal | 81 MW | Retired | April 2016 |
| 4 | Conventional Steam Coal | 81 MW | Retired | April 2016 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 138 kV, 69 kV
- Transmission or distribution system owner
- East Kentucky Power Coop, Inc
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- SERC
Transmission lines within 15 mi (5)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 3, 4 scheduled to retire, 162 MW · EIA-860M
- Stated Units 1, 2 scheduled to retire, 54 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| AEUG Madison Solar, LLC Under construction | Solar | 4.6 mi | 100 |
| J K Smith Postponed | Coal | 8.7 mi | 608.4 |
| KY No. 11 L&D Hydroelectric Project Permitted | Hydro | 10.9 mi | 2.8 |
| Cooperative Solar Two-Fayette Under construction | Solar | 11.1 mi | 40 |