Show on map
Dansby — Power plant · Gas, steam turbine · City of Bryan - (TX)Central Utility Plant - Texas A&M — Gas, combined cycle · TX · 5 MW · 16.1 km away
  • Combustion
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 11% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1978
Net generation, 2025
195,191 MWh
Grid
69 kV to City of Bryan - (TX) (ERCO)
Location
Brazos County, Texas

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
48 years since 1978
Unused energy
1,585 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
12,901 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
69
Transmission owner
City of Bryan - (TX)
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110045641748
Subparts reported
D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001047
Fuel burned (MMBtu), 20252,518,108
Capacity factor, 20250.110
Heat rate (Btu/kWh), 202512,900.7
Net generation (MWh), 2025195,191
Balancing authority codeERCO

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
City of Bryan - (TX) Operator EIA-860M
CITY OF BRYAN TEXAS Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Central Utility Plant - Texas A&M Announced Gas, combined cycle 16.1 km 5

Sources EIA-860M

Sources

Attribution