Show on map
Darlington County 230 kV line — Transmission lineFishwater Solar — Postponed · Solar · SC · 2 MW · 0.1 mi awayFairfield Solar — Postponed · Solar · SC · 10 MW · 0.3 mi awayRobinson Solar Plant — Filed · Solar · SC · 76 MW · 0.5 mi awayBell Solar — Postponed · Solar · SC · 6.1 MW · 1.0 mi awayScarlet Solar — Postponed · Solar · SC · 2 MW · 1.3 mi awayMadison Solar — Postponed · Solar · SC · 10.9 MW · 1.5 mi awayMiddleton Solar — Postponed · Solar · SC · 2 MW · 2.3 mi awayDadswell Solar — Postponed · Solar · SC · 1 MW · 3.0 mi awayMcCormick Solar — Postponed · Solar · SC · 2 MW · 3.3 mi awayLotus Solar — Permitted · Solar · SC · 75 MW · 4.2 mi awayShorthorn Solar — Permitted · Solar · SC · 60 MW · 4.4 mi awayRollins Solar — Permitted · Solar · SC · 74.9 MW · 4.8 mi awayB & K Solar — Under construction · Solar · SC · 74.9 MW · 6.0 mi awayGEB Solar — Permitted · Solar · SC · 50 MW · 7.2 mi awayCulpepper Solar — Permitted · Solar · SC · 74.9 MW · 12.3 mi awayRoss Solar — Permitted · Solar · SC · 74.9 MW · 12.6 mi away
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Darlington County 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-SC
Owner (as stated)
Duke Energy Progress

Details

Who’s behind it

Owner
Duke Energy Progress

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
37
Substations at the ends (as the source names them)
Darlington County
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduke energy progress
HIFLD line ID101543
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Fishwater Solar Postponed Solar 0.1 mi 2
Fairfield Solar Postponed Solar 0.3 mi 10
Robinson Solar Plant Filed Solar 0.5 mi 76
Bell Solar Postponed Solar 1.0 mi 6.1
Scarlet Solar Postponed Solar 1.3 mi 2
Madison Solar Postponed Solar 1.5 mi 10.9
Middleton Solar Postponed Solar 2.3 mi 2
Dadswell Solar Postponed Solar 3.0 mi 1
McCormick Solar Postponed Solar 3.3 mi 2
Lotus Solar Permitted Solar 4.2 mi 75
Shorthorn Solar Permitted Solar 4.4 mi 60
Rollins Solar Permitted Solar 4.8 mi 74.9
B & K Solar Under construction Solar 6.0 mi 74.9
GEB Solar Permitted Solar 7.2 mi 50
Culpepper Solar Permitted Solar 12.3 mi 74.9
Ross Solar Permitted Solar 12.6 mi 74.9

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution