Show on map
Davis Creek 138 kV line — Transmission lineSV CSG Manteno — Permitted · Solar + storage · IL · 10 MW · 0.5 mi awayKA 340 — Under construction · Solar · IL · 5 MW · 5.4 mi awaySV CSG St Anne 1 — Permitted · Solar · IL · 5 MW · 12.5 mi away
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Davis Creek 138 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-IL
Owner (as stated)
Commonwealth Edison

Details

Who’s behind it

Owner
Commonwealth Edison

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
6
Substations at the ends (as the source names them)
Davis Creek
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itcommonwealth edison
HIFLD line ID150739
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
SV CSG Manteno Permitted Solar + storage 0.5 mi 10
KA 340 Under construction Solar 5.4 mi 5
SV CSG St Anne 1 Permitted Solar 12.5 mi 5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution