Davis Creek 345 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 345 kV
- States crossed
- US-IL
- Owner (as stated)
- Commonwealth Edison
Details
Who’s behind it
- Owner
- Commonwealth Edison
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 33
- Substations at the ends (as the source names them)
- Davis Creek
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | commonwealth edison |
| HIFLD line ID | 139484 |
| Voltage class | 345 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| SV CSG Manteno Permitted | Solar + storage | 1.7 mi | 10 |
| Steger Under construction | Solar | 2.6 mi | 2 |
| Falconhead Solar, LLC Under construction | Solar | 2.8 mi | 5 |
| KA 340 Under construction | Solar | 4.8 mi | 5 |
| W 167th St Under construction | Solar | 11.1 mi | 1.5 |
| IL2 - W109 Under construction | Solar | 12.3 mi | 4.9 |
| Elwood 1-SLCHI901 Postponed | Solar | 13.3 mi | 1.3 |
Sources EIA-860M