Show on map
- Wind & solar
- Loads
- In development
- Under construction
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Loads
- In development
- Under construction
- Size not stated
- Other infrastructure
Dayton - Sumpter 120 kV: route and 3 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Dayton - Sumpter 120 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 120 kV
- States crossed
- US-MI
- Owner (as stated)
- Wyandotte Municipal Serv Comm
Details
Who’s behind it
- Owner
- Wyandotte Municipal Serv Comm
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 1
- Substations at the ends (as the source names them)
- Dayton to Sumpter
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | wyandotte municipal serv comm |
| HIFLD line ID | 122847 |
| Voltage class | 100-161 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Project Cannoli Data Center Filed | Large load | 6.1 mi | |
| Wheeler Center Solar Park Postponed | Solar | 9.7 mi | 20 |
| Strasburg Solar Park Under construction | Solar | 13.9 mi | 100 |
Sources FAA OE/AAA · EIA-860M