Show on map
DeBary — Power plant · Oil · Duke Energy Florida, LLCSorrento — Solar · FL · 40 MW · 23.0 km away
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 2% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1975
Net generation, 2025
103,465 MWh
Grid
230 kV to Duke Energy Florida, Inc (FPC)
Location
Volusia County, Florida

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
51 years since 1975
Unused energy
6,449 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
12,574 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110012446317
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001014
Fuel burned (MMBtu), 20251,300,963
Capacity factor, 20250.016
Heat rate (Btu/kWh), 202512,573.9
Net generation (MWh), 2025103,465.0
Balancing authority codeFPC

Retirement

EIA-860M September 2026StatusSome generators are scheduled to retire; most of the plant's capacity is not, so it is shown as operating. As of EIA-860M for September 2026.
Capacity retired
66.8 MW
Generators retired
1
Next scheduled retirement
June 2034
Capacity scheduled to retire
334 MW
Generators scheduled to retire
5
Share of in-service capacity scheduled
45%
Capacity still in service
748 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
P1Petroleum Liquids66.8 MWRetiredDecember 2016
2Petroleum Liquids66.8 MWScheduled to retireJune 2034
3Petroleum Liquids66.8 MWScheduled to retireJune 2034
4Petroleum Liquids66.8 MWScheduled to retireJune 2034
5Petroleum Liquids66.8 MWScheduled to retireJune 2034
6Petroleum Liquids66.8 MWScheduled to retireJune 2034

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
230 kV
Transmission or distribution system owner
Duke Energy Florida, Inc
Balancing authority
Progress Energy Florida
NERC region
SERC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Duke Energy Florida, LLC Operator EIA-860M
Duke Energy Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Units 2, 3, 4, 5, 6 scheduled to retire, 334 MW · EIA-860M
  • Stated Unit P1 scheduled to retire, 66.8 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Sorrento Postponed Solar 23.0 km 40

Sources EIA-860M