Show on map
Decker Creek — Power plant · Gas, combustion turbine · Austin EnergyAustin TX GigaFactory — Under construction · Solar · TX · 2.3 MW · 5.8 mi awayAustin TX GigaFactory — Postponed · Solar · TX · 1 MW · 5.8 mi awayPecan Crossing Building 2 (Pflugerville data centre) — Filed · Large load · TX · 7.9 mi awayAMD Phase 2 (Austin data centre) — Filed · Large load · TX · 8.1 mi awaySMT DC Austin I (Austin data centre) — Filed · Large load · TX · 10.6 mi awayAUSTIN DATA CENTER 2 — Under construction · Large load · TX · 12.4 mi awaySABEY DATA CENTER AUSTIN — Under construction · Large load · TX · 13.0 mi awayBuilding B (Round Rock data centre) — Filed · Large load · TX · 13.1 mi awayDogwood Creek Solar and BESS — Postponed · Solar + storage · TX · 878.7 MW · 14.8 mi away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Decker Creek

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbine Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1988
Net generation, 2025
0 MWh
Grid
138 kV to Austin Energy (ERCO)
Location
Travis County, Texas
Operated by
Austin EnergySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Owner
Austin EnergySource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
38 years since 1988
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110001869078
Subparts reported
C
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1006650
Fuel burned (MMBtu), 20250
Net generation (MWh), 20250
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
726 MW
Generators retired
2
Capacity still in service
206 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Natural Gas Steam Turbine321 MWRetiredOctober 2020
2Natural Gas Steam Turbine405 MWRetiredMarch 2022

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
138 kV
Transmission or distribution system owner
Austin Energy
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 2 scheduled to retire, 405 MW · EIA-860M
  • Stated Unit 1 scheduled to retire, 321 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · OpenStreetMap · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

© OpenStreetMap contributors

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Austin TX GigaFactory × 2 units Under construction Solar 5.8 mi 3.3
Pecan Crossing Building 2 (Pflugerville data centre) Filed Large load 7.9 mi
AMD Phase 2 (Austin data centre) Filed Large load 8.1 mi
SMT DC Austin I (Austin data centre) Filed Large load 10.6 mi
AUSTIN DATA CENTER 2 Under construction Large load 12.4 mi
SABEY DATA CENTER AUSTIN Under construction Large load 13.0 mi
Building B (Round Rock data centre) Filed Large load 13.1 mi
Dogwood Creek Solar and BESS Postponed Solar + storage 14.8 mi 878.7

Sources EIA-860M · FAA OE/AAA · EPA ICIS-NPDES

Sources

Attribution