Power plant · Hydro

Key facts

Power plant · Hydroran 34% of 2025 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1923
Net generation, 2025
36,850 MWh
Grid
69 kV to Northern States Power Co (MISO)
Location
Eau Claire County, Wisconsin
Operated by
Northern States Power Co - MinnesotaSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
103 years since 1923
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 2025125,733
Capacity factor, 20250.342
Net generation (MWh), 202536,850
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Capacity retired
1.2 MW
Generators retired
2
Next scheduled retirement
December 2033
Capacity scheduled to retire
12.3 MW
Generators scheduled to retire
5
Share of in-service capacity scheduled
100%
Capacity still in service
12.3 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
6Conventional Hydroelectric0.5 MWRetiredDecember 2007
7Conventional Hydroelectric0.7 MWRetiredDecember 2007
1Conventional Hydroelectric2.9 MWScheduled to retireDecember 2033
2Conventional Hydroelectric2.6 MWScheduled to retireDecember 2033
3Conventional Hydroelectric2.6 MWScheduled to retireDecember 2033
4Conventional Hydroelectric2.6 MWScheduled to retireDecember 2033
5Conventional Hydroelectric1.6 MWScheduled to retireDecember 2033

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
Northern States Power Co
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 2, 3, 4, 5 scheduled to retire, 12.3 MW · EIA-860M
  • Stated Units 6, 7 scheduled to retire, 1.2 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Elk Mound Postponed Gas, combustion turbine 9.4 km 71
Seven Mile Creek LFG Postponed Biomass 10.9 km 0.8