Delta (MS) — Power plant · Gas, steam turbine · Entergy Mississippi LLCDelta Solar Plant — Solar · LA · 80 MW · 0.1 km awayGirasol Solar Farm — Solar · MS · 100 MW · 14.7 km away
  • Combustion
  • Wind & solar
  • In development
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 0% of 2010 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1953
Net generation, 2010
3,067 MWh
Grid
115 kV to Entergy Mississippi Inc (MISO)
Location
Bolivar County, Mississippi

Output

Net generation MWh by year, 2001 to 2010
Fuel burned MMBtu by year, 2001 to 2010
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
73 years since 1953
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110010569535
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000700
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2012
Capacity retired
225 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Natural Gas Steam Turbine112.5 MWRetiredDecember 2012
2Natural Gas Steam Turbine112.5 MWRetiredDecember 2012

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
115 kV
Transmission or distribution system owner
Entergy Mississippi Inc
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
SERC
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Entergy Mississippi LLC Operator EIA-860M
Entergy Corp Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Units 1, 2 scheduled to retire, 225 MW · EIA-860M
  • In service · EIA-860M

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Delta Solar Plant Announced Solar 0.1 km 80
Girasol Solar Farm Announced Solar 14.7 km 100

Sources EIA-860M