Des Moines Wastewater Reclamation Fac — Power plant · Biomass · Des Moines Metro WRF
  • Bioenergy
  • Operating
  • 10 · 100 · 1,000 MW

Des Moines Wastewater Reclamation Fac

Power plant · Biomass

Key facts

Power plant · Biomassran 0% of 2025 Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2015
Net generation, 2025
74 MWh
Grid
13 kV to MidAmerican Energy Co (MISO)
Location
Polk County, Iowa
Operated by
Des Moines Metro WRFSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2025
74MWh
Fuel burned, 2025
799MMBtu
Capacity factor, 2025
0.3%
Heat rate, 2025
10,728Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
2025747990.3%10,728
2024717520.3%10,658
2023737780.3%10,728
2022767060.3%9,236
20211351,1650.5%8,614
20201,49217,8506.1%11,964
201916,174210,18465.9%12,995
201814,319189,09858.4%13,206
20177,471106,02830.5%14,192
201622,33761,47190.8%—
201514,574175,67659.4%12,054
201412,379151,01350.5%12,199
201313,335152,63654.4%11,446
201210,695110,63543.5%10,345
201112,349163,91350.3%13,273
20109,631120,07039.3%12,466
20097,887114,78632.2%14,554
20088,61031135.0%—
20079,543122,76338.9%12,864
200613,514211,21455.1%15,629
200512,431258,58050.7%20,801
200411,280269,26845.9%23,872
200313,016254,94953.1%19,587
200210,948670,41744.6%—
200111,316193,83046.1%17,129
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)