Des Moines Wastewater Reclamation Fac
Power plant · Biomass
Key facts
Power plant · Biomassran 0% of 2025 Standby- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2015
- Net generation, 2025
- 74 MWh
- Grid
- 13 kV to MidAmerican Energy Co (MISO)
- Location
- Polk County, Iowa
- Operated by
- Des Moines Metro WRFSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Biomass and waste
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
- Technology
- Biomass source: “Other Waste Biomass”
- Age
- 11 years since 2015
- Heat rate
- 10,728 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 799 |
| Capacity factor, 2025 | 0.003 |
| Heat rate (Btu/kWh), 2025 | 10,727.7 |
| Net generation (MWh), 2025 | 74.48 |
| Balancing authority code | MISO |
Retirement
- Capacity retired
- 1.8 MW
- Generators retired
- 3
- Capacity still in service
- 2.8 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 01 | Other Waste Biomass | 0.6 MW | Retired | August 2016 |
| 02 | Other Waste Biomass | 0.6 MW | Retired | August 2016 |
| 03 | Other Waste Biomass | 0.6 MW | Retired | August 2016 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 13 kV
- Transmission or distribution system owner
- MidAmerican Energy Co
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- MRO
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 01, 02, 03 scheduled to retire, 1.8 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| SICULUS, INC. Built | Large load | 5.2 mi | |
| SE Cor Data Hall (Ankeny data centre) Under construction | Large load | 5.8 mi | |
| CLOP DES MOINES IA, LLC Built | Large load | 7.3 mi | |
| IOWA HEALTH SYSTEM Built | Large load | 7.6 mi | |
| UNITY POINT HEALTH Built | Large load | 7.6 mi | |
| EDGED DES MOINES, LLC Built | Large load | 9.0 mi | |
| DSM 18 (Des Moines data centre) Filed | Large load | 9.1 mi | |
| JORDVERT, LLC Built | Large load | 10.1 mi | |
| MCC IOWA, LLC Built | Large load | 10.3 mi | |
| Metro Methane Recovery Facility Postponed | Biomass | 10.6 mi | 1.6 |
| R & R REALTY Built | Large load | 12.0 mi | |
| MICROSOFT CORPORATION - ALLUVIUM DATA CENTER Built | Large load | 14.1 mi | |
| GINGER WEST DATA CENTER Built | Large load | 14.1 mi |