Show on map
Desert Sky — Power plant · Wind · Desert Sky Wind Farm LPGreenalia Solar Power Blackwelder Ranch — Announced · Solar · TX · 199.7 MW · 15.1 km awayBlackwelder Ranch Wind — Announced · Wind · TX · 110.4 MW · 15.1 km awayRE Maplewood — Postponed · Solar · TX · 300 MW · 17.6 km awayBig Sampson Wind — Built · Wind · TX · 265.4 MW · 23.6 km away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Wind

Key facts

Power plant · Windran 37% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2002
Net generation, 2025
541,153 MWh
Grid
138 kV to AEP Texas North Company (ERCO)
Location
Pecos County, Texas
Operated by
Desert Sky Wind Farm LPSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2002 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
24 years since 2002
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000908896, G100000909603, G100000909817
Location id
L100000906597
Eia plant ids
55992
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
AEP Texas North Company
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20251,846,414
Capacity factor, 20250.368
Net generation (MWh), 2025541,153
Balancing authority codeERCO

Wind turbines

Turbines
91
Turbine capacity (MW)
142.7
Turbine models
3 GE Wind GE1.7-103, 1 GE Wind GE1.5-70.5, 71 GE Wind GE1.5-82.5 and 16 GE Wind GE1.85-87.5
Hub height (m)
65–80
Rotor diameter (m)
70.5–103
Year online
2001

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Greenalia Solar Power Blackwelder Ranch Announced Solar 15.1 km 199.7
Blackwelder Ranch Wind Announced Wind 15.1 km 110.4
RE Maplewood Postponed Solar 17.6 km 300
Big Sampson Wind Built Wind 23.6 km 265.4

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution