Show on map
Desoto - Fall Creek 345 kV — Transmission lineSERVER FARM — Under construction · Large load · IN · 4.3 mi awayBig Blue River Wind Farm — Postponed · Wind · IN · 200 MW · 4.8 mi awayNew Jay PV & BESS — Announced · Solar · IN · 39 MW · 11.1 mi awayBlackford Wind — Under construction · Wind · IN · 200 MW · 11.4 mi awayCabin Creek Renewable Energy Station — Postponed · Biomass · IN · 4 MW · 12.0 mi awayBlackford Solar — Under construction · Solar · IN · 150 MW · 12.6 mi awayRose Gold Solar — Announced · Solar · IN · 100 MW · 12.9 mi awayRose Gold Solar — Postponed · Solar · IN · 150 MW · 12.9 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Desoto - Fall Creek 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-IN

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
25
Substations at the ends (as the source names them)
Desoto to Fall Creek
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID117961
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
SERVER FARM Under construction Large load 4.3 mi
Big Blue River Wind Farm Postponed Wind 4.8 mi 200
New Jay PV & BESS Announced Solar 11.1 mi 39
Blackford Wind Under construction Wind 11.4 mi 200
Cabin Creek Renewable Energy Station Postponed Biomass 12.0 mi 4
Blackford Solar Under construction Solar 12.6 mi 150
Rose Gold Solar × 2 units Announced Solar 12.9 mi 250

Sources EPA ICIS-NPDES · EIA-860M

Sources

Attribution