- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Detour: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Detour
Power plant · Oil
Key facts
Power plant · Oilran 4% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1973
- Net generation, 2025
- 1,841 MWh
- Grid
- 69 kV to American Transmission Co (MISO)
- Location
- Chippewa County, Michigan
- Operated by
- Cloverland Electric Co-opSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 1,841
MWh - Fuel burned, 2025
- 24,961
MMBtu - Capacity factor, 2025
- 3.5
% - Heat rate, 2025
- 13,558
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 1,841 | 24,961 | 3.5% | 13,558 |
| 2024 | 1,512 | 18,800 | 2.9% | 12,434 |
| 2023 | 592 | 8,519 | 1.1% | 14,390 |
| 2022 | 623 | 6,025 | 1.2% | 9,671 |
| 2021 | 845 | 11,656 | 1.6% | 13,794 |
| 2020 | 190 | 5,599 | 0.4% | 29,468 |
| 2019 | 371 | 7,267 | 0.7% | 19,588 |
| 2018 | -92 | 2,312 | — | — |
| 2017 | 0 | 0 | — | — |
| 2016 | 0 | 0 | — | — |
| 2015 | 0 | 0 | — | — |
| 2014 | 338 | 5,277 | 0.6% | 15,612 |
| 2013 | 458 | 8,072 | 0.9% | 17,624 |
| 2012 | 726 | 10,844 | 1.4% | 14,937 |
| 2011 | 735 | 11,675 | 1.4% | 15,884 |
| 2010 | 751 | 11,725 | 1.4% | 15,612 |
| 2009 | 2,171 | 28,328 | 4.1% | 13,048 |
| 2008 | 871 | 13,627 | 1.7% | 15,645 |
| 2007 | 540 | 8,776 | 1.0% | 16,252 |
| 2006 | 29 | 3,405 | 0.1% | — |
| 2005 | 350 | 6,789 | 0.7% | 19,396 |
| 2004 | -230 | 576 | — | — |
| 2003 | 1,126 | 11,857 | 2.1% | 10,530 |
| 2002 | 0 | 0 | — | — |
| 2001 | 28 | 676 | 0.1% | 24,143 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.