Deutsche Bank- Piscataway Solar
Power plant · Solar
Key facts
Power plant · Solarran 11% of 2021 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2011
- Net generation, 2021
- 980 MWh
- Location
- Middlesex County, New Jersey
- Operated by
- Deutsche BankSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 15 years since 2011
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Balancing authority code | PJM |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- May 2022
- Capacity retired
- 1 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| DBPIS | Solar Photovoltaic | 1 MW | Retired | May 2022 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- PJM
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit DBPIS scheduled to retire, 1 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| NJ 1 DATA CENTER Built | Large load | 0.9 mi | |
| Prologis - SLCNJ001 - Community Solar Under construction | Solar | 1.6 mi | 3.2 |
| EVOQUE DATA CENTER SOLUTIONS - PNJ1 Built | Large load | 2.0 mi | |
| BARCLAYS CAPITAL DATA CENTER Built | Large load | 2.1 mi | |
| FIDESSA Built | Large load | 2.2 mi | |
| MORGAN STANLEY DATA CENTER Built | Large load | 2.5 mi | |
| BPL NJ - Belmont Under construction | Solar | 2.8 mi | 1.8 |
| Milltown Onsite BESS Under construction | Battery storage | 7.2 mi | 13.2 |
| Middlesex Energy Center LLC Postponed | Gas, combined cycle | 10.1 mi | 570 |
| Gateway Energy Center, LLC Postponed | Gas, combined cycle | 10.8 mi | 440 |
| 50 Meister Ave Under construction | Solar | 11.2 mi | 1.5 |
| BLOOMBERG DATA CENTER Built | Large load | 11.8 mi | |
| BARCLAYS CAPITAL DATA CENTER Built | Large load | 12.9 mi | |
| PROPOSED DATA CENTER DEVELOPMENT Under construction | Large load | 13.7 mi | |
| Coreweave Under construction | Large load | 14.7 mi |