Show on map
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
Gateway Energy Center, LLC: the source's site coordinate and 15 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Gateway Energy Center, LLC
Gas, combined cycle
Key facts
Gas, combined cycle Postponed (source status: Canceled or Postponed) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Location
- Middlesex County, New Jersey
Details
Who’s behind it
- Developer
- Gateway Energy Center, LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
- EIA plant
- 59538 generator CT001
Timeline
- Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Middlesex Energy Center LLC Postponed | Gas, combined cycle | 0.7 mi | 570 |
| Milltown Onsite BESS Under construction | Storage | 4.9 mi | 13.2 |
| BARCLAYS CAPITAL DATA CENTER Built | Large load | 9.8 mi | |
| EVOQUE DATA CENTER SOLUTIONS - PNJ1 Built | Large load | 9.9 mi | |
| BLOOMBERG DATA CENTER Built | Large load | 10.2 mi | |
| NJ 1 DATA CENTER Built | Large load | 10.9 mi | |
| Prologis - SLCNJ001 - Community Solar Under construction | Solar | 11.8 mi | 3.2 |
| BPL NJ - Belmont Under construction | Solar | 12.2 mi | 1.8 |
| FIDESSA Built | Large load | 12.3 mi | |
| MORGAN STANLEY DATA CENTER Built | Large load | 12.5 mi | |
| Elevate Arthur Kill Under construction | Storage | 12.8 mi | 15.1 |
| Swiftsure Postponed | Storage | 13.6 mi | 121 |
| BARCLAYS CAPITAL DATA CENTER Built | Large load | 14.2 mi | |
| East Windsor Solar 1 LLC Permitted | Solar | 14.3 mi | 1.4 |
| PROPOSED DATA CENTER DEVELOPMENT Under construction | Large load | 14.6 mi |
Sources EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES