DGS Five Points
Power plant · Storage
Key facts
Power plant · Storage Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2026
- Grid
- 138 kV, 12 kV to AEP Texas Central Company (ERCO)
- Location
- Taylor County, Texas
- Operated by
- Distributed Generation Solutions LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Storage source: “Batteries”
- Age
- 0 years since 2026
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Balancing authority code | ERCO |
Timeline
- In service · EIA-860M
Sources
2 sourcesAround this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| ABILENE DATA CENTER PH3 BLDGS 9-10 Under construction | Large load | 3.9 km | |
| Summerhill BESS Announced | Storage | 5.6 km | 143 |
| LONGHORN DATA CENTER Built | Large load | 6.1 km | |
| Chimney Rock BESS Studied | Storage | 9.2 km | 156 |
Sources EPA ICIS-NPDES · FAA OE/AAA · ERCOT · EIA-860M · EPA ICIS-Air
Sources
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)
- FAA OE/AAA Part 77 obstruction evaluation case archives (data-centre sites, buildings and cranes)
- ERCOT GIS Report (Generator Interconnection Status)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)