Show on map
DIA 8 — Power plant · Solar · Altus Power America Management, LLCCrusoe Brighton Buildout TI — Filed · Large load · CO · 7.0 mi awaySAMARITANS PURSE DATA CENTER — Built · Large load · CO · 10.7 mi awayPivot Solar 43 LLC — Under construction · Solar · CO · 3.5 MW · 10.7 mi awayPivot Solar 53 LLC — Under construction · Solar · CO · 4 MW · 10.7 mi awayDEN1-DC2 (Aurora data centre) — Filed · Large load · CO · 12.0 mi awayQTS AURORA LLC - QTS DEN1 — Built · Large load · CO · 12.1 mi awayJPMORGAN CHASE - PROJECT SYCAMORE AURORA — Built · Large load · CO · 12.6 mi awayAPA060 - Phase 5 MDC (Aurora data centre) — Built · Large load · CO · 13.5 mi awayAMAZON DATA SERVICES - DEN-22 — Built · Large load · CO · 13.9 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 16% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2023
Net generation, 2025
6,268 MWh
Grid
14 kV to Public Service Co of Colorado (PSCO)
Location
Adams County, Colorado
Operated by
Altus Power America Management, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2023 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
3 years since 2023
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000838452
Location id
L100000832841
Eia plant ids
65806
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
13.80
Transmission owner
Public Service Co of Colorado
Balancing authority code
PSCO
Balancing authority name
Public Service Company of Colorado
Fuel burned (MMBtu), 202521,386
Capacity factor, 20250.159
Net generation (MWh), 20256,268
Balancing authority codePSCO

Solar array

Array area (acres)
24.8
AC capacity (MW)
4.5
DC capacity (MW)
4.5
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2022

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Crusoe Brighton Buildout TI Filed Large load 7.0 mi
SAMARITANS PURSE DATA CENTER Built Large load 10.7 mi
Pivot Solar 43 LLC Under construction Solar 10.7 mi 3.5
Pivot Solar 53 LLC Under construction Solar 10.7 mi 4
DEN1-DC2 (Aurora data centre) Filed Large load 12.0 mi
QTS AURORA LLC - QTS DEN1 Built Large load 12.1 mi
JPMORGAN CHASE - PROJECT SYCAMORE AURORA Built Large load 12.6 mi
APA060 - Phase 5 MDC (Aurora data centre) Built Large load 13.5 mi
AMAZON DATA SERVICES - DEN-22 Built Large load 13.9 mi

Sources FAA OE/AAA · EPA ICIS-NPDES · EIA-860M · EPA ICIS-Air

Sources

Attribution