Dickerson — Power plant · Coal · Lanyard Power Holdings, LLCTLREZN2024-0003 data center application — Large load · VA · 13.4 km awayIAD94 — Large load · MD · 14.0 km awayTLSPEX2025-0003 data center application, CARDINAL INDUSTRIAL PARK subdivision — Large load · VA · 14.2 km awayVANTAGE DATA CENTER VA3 LLC — Large load · VA · 14.9 km awayEPLAN-2024-0059 data center application, TUSCARORA CROSSING LB1 PH1 subdivision — Large load · VA · 15.0 km awayTuscarora LB7 - Building A (Leesburg data centre) — Large load · VA · 15.1 km awaySTPL-2023-0025 data center application — Large load · VA · 15.2 km awayLEGI-2024-0037 data center application — Large load · VA · 15.4 km awayBelmont Innovation Campus Building 3 (Ashburn data centre) — Large load · VA · 15.6 km awayEPLAN-2024-0211 data center application, CROSSTRAIL INDUSTRL LAND CONDO subdivision — Large load · VA · 15.6 km awayFANNIE MAE UTC DATA CENTER — Large load · MD · 15.8 km awaySTPL-2022-0040 data center application — Large load · VA · 15.9 km awaySTPL-2023-0007 data center application, PHILIPS ELECTRONICS NA CORP subdivision — Large load · VA · 15.9 km awayLEGI-2023-0048 and EPLAN-2025-0195 data center applications — Large load · VA · 15.9 km awaySTPL-2020-0046 data center application, TUSCARORA CROSSING SOUTH subdivision — Large load · VA · 15.9 km awayEPLAN-2025-0061 data center application, ASHBURN VILLAGE OFFICE PARK subdivision — Large load · VA · 16.2 km awaySTACK INFRASTRUCTURE - SI NVA06A LLC — Large load · VA · 16.7 km awayStack NVA 06B NE Corner (Leeseburg data centre) — Large load · VA · 16.8 km awayFrederick-Carroll County Renewable Waste — Waste to energy · MD · 56 MW · 17.1 km awayGeorge Washington University - VA Campus Bldg II — Large load · VA · 17.3 km awayMICROSOFT CORPORATION – LEESBURG DATA CENTER (IAD01-02-03-04-05) — Large load · VA · 17.6 km awayVISA USA INCORPORATED — Large load · VA · 17.9 km awayLEGI-2023-0064 data center application — Large load · VA · 17.9 km awayLEGI-2023-0084 data center application, LUCK STONE CORPORATION subdivision — Large load · VA · 18.1 km awayAMAZON DATA SERVICES INC IAD-667, IAD-668, IAD-669, IAD-670, AND IAD-671 — Large load · VA · 18.3 km awayLEGI-2023-0052 data center application — Large load · VA · 18.6 km awayEPLAN-2025-0126 data center application — Large load · VA · 18.6 km awayHAYDEN TECHNOLOGIES, LLC. — Large load · VA · 18.8 km awayAMAZON DATA SERVICES, INC. IAD-114 IAD-115 — Large load · VA · 19.2 km awaySTPL-2022-0012 data center application, NA DULLES REAL ESTATE subdivision — Large load · VA · 19.3 km awayCOMPASS IAD DATACENTER — Large load · VA · 19.6 km awayAMAZON DATA SERVICES INC - IAD-163/164/174 — Large load · VA · 19.7 km awayAMAZON DATA SERVICES, INC. IAD 50 IAD 60 IAD-71 IAD-78 IAD-79 IAD-80 — Large load · VA · 20.3 km awaySTPL-2023-0041 data center application — Large load · VA · 20.4 km awayPSE Mobile Crane-Equinix DC17 — Large load · VA · 20.5 km awayIAD 174 Amazon Data Center — Large load · VA · 20.5 km awayEPLAN-2024-0193 and LEGI-2025-0027 data center applications, BEAUMEADE PARCEL C2 subdivision — Large load · VA · 20.5 km awayEPLAN-2024-0077 data center application — Large load · VA · 20.5 km awayNTT GLOBAL DATA CENTERS VA2, LLC — Large load · VA · 20.6 km awayCYRUSONE KINCORA — Large load · VA · 20.6 km awayEPLAN-2024-0058 data center application — Large load · VA · 20.6 km awayNTT GLOBAL DATA CENTERS AMERICAS, INC.- VA1 — Large load · VA · 20.9 km awayEquinix LLC — Large load · VA · 20.9 km awayINOVA HEALTH CARE SYSTEMS - IT OPERATIONS — Large load · VA · 20.9 km awaySTPL-2023-0008 and LEGI-2024-0058 data center applications, LOUDOUN TECH CENTER subdivision — Large load · VA · 20.9 km awayEvergreen Energy Center, LLC — Storage · VA · 20 MW · 20.9 km awayEPLAN-2025-0028 data center application — Large load · VA · 21.0 km away21571 Beaumeade Circle LLC — Large load · VA · 21.0 km away21110 RIDGETOP CIRCLE LLC — Large load · VA · 21.0 km awayCYRUSONE LOUDOUN TECH CENTER — Large load · VA · 21.0 km away
  • Combustion
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Coal

Key facts

Power plant · Coal Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1959
Grid
Potomac Electric Power Co (PJM)
Location
Montgomery County, Maryland
Operated by
Lanyard Power Holdings, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
67 years since 1959
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
GenOn Holdings LLC
Share pct
100
Gem entity id
E100002024934
Name
Rockland Capital LP
Share pct
100
Gem entity id
E100000001289
Unit ids
G100000102368, G100000102369, G100000102370, G100000402929, G100000402930
Location id
L100000103964
Eia plant ids
65284
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
August 2020
Capacity retired
588 MW
Generators retired
3
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
2Conventional Steam Coal196 MWRetiredAugust 2020
3Conventional Steam Coal196 MWRetiredAugust 2020
ST1Conventional Steam Coal196 MWRetiredAugust 2020

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Transmission or distribution system owner
Potomac Electric Power Co
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 2, 3, ST1 scheduled to retire, 588 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · GEM · LBNL · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
TLREZN2024-0003 data center application Filed Large load 13.4 km
IAD94 Filed Large load 14.0 km
TLSPEX2025-0003 data center application, CARDINAL INDUSTRIAL PARK subdivision Filed Large load 14.2 km
VANTAGE DATA CENTER VA3 LLC Built Large load 14.9 km
EPLAN-2024-0059 data center application, TUSCARORA CROSSING LB1 PH1 subdivision Permitted Large load 15.0 km
Tuscarora LB7 - Building A (Leesburg data centre) Filed Large load 15.1 km
STPL-2023-0025 data center application Permitted Large load 15.2 km
LEGI-2024-0037 data center application Filed Large load 15.4 km
Belmont Innovation Campus Building 3 (Ashburn data centre) Filed Large load 15.6 km
EPLAN-2024-0211 data center application, CROSSTRAIL INDUSTRL LAND CONDO subdivision Filed Large load 15.6 km
FANNIE MAE UTC DATA CENTER Built Large load 15.8 km
STPL-2022-0040 data center application Permitted Large load 15.9 km
STPL-2023-0007 data center application, PHILIPS ELECTRONICS NA CORP subdivision Permitted Large load 15.9 km
LEGI-2023-0048 and EPLAN-2025-0195 data center applications Permitted Large load 15.9 km
STPL-2020-0046 data center application, TUSCARORA CROSSING SOUTH subdivision Permitted Large load 15.9 km
EPLAN-2025-0061 data center application, ASHBURN VILLAGE OFFICE PARK subdivision Filed Large load 16.2 km
STACK INFRASTRUCTURE - SI NVA06A LLC Built Large load 16.7 km
Stack NVA 06B NE Corner (Leeseburg data centre) Filed Large load 16.8 km
Frederick-Carroll County Renewable Waste Postponed Waste to energy 17.1 km 56
George Washington University - VA Campus Bldg II Built Large load 17.3 km
MICROSOFT CORPORATION – LEESBURG DATA CENTER (IAD01-02-03-04-05) Built Large load 17.6 km
VISA USA INCORPORATED Built Large load 17.9 km
LEGI-2023-0064 data center application Permitted Large load 17.9 km
LEGI-2023-0084 data center application, LUCK STONE CORPORATION subdivision Filed Large load 18.1 km
AMAZON DATA SERVICES INC IAD-667, IAD-668, IAD-669, IAD-670, AND IAD-671 Built Large load 18.3 km
LEGI-2023-0052 data center application Permitted Large load 18.6 km
EPLAN-2025-0126 data center application Filed Large load 18.6 km
HAYDEN TECHNOLOGIES, LLC. Built Large load 18.8 km
AMAZON DATA SERVICES, INC. IAD-114 IAD-115 Built Large load 19.2 km
STPL-2022-0012 data center application, NA DULLES REAL ESTATE subdivision Permitted Large load 19.3 km
COMPASS IAD DATACENTER Built Large load 19.6 km
AMAZON DATA SERVICES INC - IAD-163/164/174 Built Large load 19.7 km
AMAZON DATA SERVICES, INC. IAD 50 IAD 60 IAD-71 IAD-78 IAD-79 IAD-80 Built Large load 20.3 km
STPL-2023-0041 data center application Permitted Large load 20.4 km
PSE Mobile Crane-Equinix DC17 Filed Large load 20.5 km
IAD 174 Amazon Data Center Filed Large load 20.5 km
EPLAN-2024-0193 and LEGI-2025-0027 data center applications, BEAUMEADE PARCEL C2 subdivision Permitted Large load 20.5 km
EPLAN-2024-0077 data center application Filed Large load 20.5 km
NTT GLOBAL DATA CENTERS VA2, LLC Built Large load 20.6 km
CYRUSONE KINCORA Built Large load 20.6 km
EPLAN-2024-0058 data center application Filed Large load 20.6 km
NTT GLOBAL DATA CENTERS AMERICAS, INC.- VA1 Built Large load 20.9 km
Equinix LLC Built Large load 20.9 km
INOVA HEALTH CARE SYSTEMS - IT OPERATIONS Built Large load 20.9 km
STPL-2023-0008 and LEGI-2024-0058 data center applications, LOUDOUN TECH CENTER subdivision Permitted Large load 20.9 km
Evergreen Energy Center, LLC Under construction Storage 20.9 km 20
EPLAN-2025-0028 data center application Filed Large load 21.0 km
21571 Beaumeade Circle LLC Built Large load 21.0 km
21110 RIDGETOP CIRCLE LLC Built Large load 21.0 km
CYRUSONE LOUDOUN TECH CENTER Built Large load 21.0 km

Sources Loudoun County · FAA OE/AAA · Virginia DEQ · EPA ICIS-Air · EIA-860M