Dillingham — Power plant · Oil · Nushagak Electric Coop, Inc
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 20% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1988
Net generation, 2025
18,314 MWh
Grid
12 kV to Nushagak Electric Coop, Inc
Location
Dillingham County, Alaska
Operated by
Nushagak Electric Coop, IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
38 years since 1988
Unused energy
74 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
9,521 Btu/kWh 2025
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 2025174,370
Capacity factor, 20250.199
Heat rate (Btu/kWh), 20259,521.1
Net generation (MWh), 202518,314

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
4.1 MW
Generators retired
6
Capacity still in service
10.5 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
IC9Petroleum Liquids0.8 MWRetiredMarch 2006
8Petroleum Liquids0.8 MWRetiredApril 2006
5Petroleum Liquids0.7 MWRetiredMarch 2007
6Petroleum Liquids1 MWRetiredOctober 2007
3Petroleum Liquids0.3 MWRetiredFebruary 2009
16Petroleum Liquids0.5 MWRetiredAugust 2024

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
12 kV
Transmission or distribution system owner
Nushagak Electric Coop, Inc
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 16 scheduled to retire, 0.5 MW · EIA-860M
  • Stated Unit 3 scheduled to retire, 0.3 MW · EIA-860M
  • Stated Unit 6 scheduled to retire, 1 MW · EIA-860M
  • Stated Unit 5 scheduled to retire, 0.7 MW · EIA-860M
  • Stated Unit 8 scheduled to retire, 0.8 MW · EIA-860M
  • Stated Unit IC9 scheduled to retire, 0.8 MW · EIA-860M
  • In service · EIA-860M

Sources