Show on map
Dillon Wind LLC — Power plant · Wind · Avangrid Power LLCWestwind Trust — Postponed · Wind · CA · 15.6 MW · 3.6 km awayPainted Hills — Postponed · Wind · CA · 17.5 MW · 5.8 km awayPainted Hills IV Wind — Withdrawn · Wind · CA · 19.5 MW · 6.1 km awaySolar Photovoltaic Project #45 — Postponed · Solar · CA · 6 MW · 7.8 km awayAlta Mesa Project Phase IV — Postponed · Wind · CA · 40 MW · 10.2 km away
  • Wind & solar
  • Operating
  • 10 · 100 · 1,000 MW

Dillon Wind LLC

Power plant · Wind

Key facts

Power plant · Windran 35% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2008
Net generation, 2025
138,337 MWh
Grid
115 kV to Southern California Edison Co (CISO)
Location
Riverside County, California
Operated by
Avangrid Power LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2008 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
18 years since 2008
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000908959
Location id
L100000906646
Eia plant ids
56791
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
115
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 2025472,006
Capacity factor, 20250.351
Net generation (MWh), 2025138,337
Balancing authority codeCISO

Wind turbines

Turbines
45
Turbine capacity (MW)
45
Turbine models
45 Mitsubishi MWT62/1.0
Hub height (m)
69
Rotor diameter (m)
61.4
Year online
2008

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Westwind Trust Postponed Wind 3.6 km 15.6
Painted Hills Postponed Wind 5.8 km 17.5
Painted Hills IV Wind Withdrawn Wind 6.1 km 19.5
Solar Photovoltaic Project #45 Postponed Solar 7.8 km 6
Alta Mesa Project Phase IV Postponed Wind 10.2 km 40

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 11, 2026Source: California ISO

Attribution