Show on map
Dover (OH) — Power plant · Coal · City of Dover - (OH)
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Coal

Key facts

Power plant · Coalran 13% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1954
Net generation, 2025
55,026 MWh
Grid
69 kV to City of Dover - (OH) (PJM)
Location
Tuscarawas County, Ohio

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
72 years since 1954
Unused energy
379 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
15,972 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110041120578
Subparts reported
C
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1006663
Eia status
By code
OP
Mw
41.60
Units
3
SB
Mw
8
Units
1
Standby mw
8
Status rule
some_units_retired
In service mw
49.60
Out of service mw
0
Fuel burned (MMBtu), 2025878,883
Capacity factor, 20250.127
Heat rate (Btu/kWh), 202515,972.1
Net generation (MWh), 202555,026
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
4 MW
Generators retired
1
Capacity still in service
49.6 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
2Conventional Steam Coal4 MWRetiredJune 2007

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
City of Dover - (OH)
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
City of Dover - (OH) Operator EIA-860M
CITY OF DOVER OHIO Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Unit 2 scheduled to retire, 4 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source