Show on map
Driver Solar — Power plant · Solar · Entergy Arkansas LLCSteel River Solar Phase 1 — Solar + storage · AR · 750 MW · 13.5 km awaySteel River Solar Phase 2 — Solar + storage · AR · 750 MW · 13.5 km awaySteel River Solar Phase 3 — Solar + storage · AR · 750 MW · 13.5 km away
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Driver Solar

Power plant · Solar

Key facts

Power plant · Solar Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Grid
230 kV to Entergy Arkansas LLC (MISO)
Location
Mississippi County, Arkansas

Output

Net generation MWh by year, 2024 to 2026

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
2 years since 2024
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000838461
Location id
L100000832850
Eia plant ids
65736
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
230
Transmission owner
Entergy Arkansas LLC
Balancing authority code
MISO
Balancing authority name
Midcontinent Independent Transmission System Operator, Inc..
Fuel burned (MMBtu), 20251,429,818
Capacity factor, 20250.319
Net generation (MWh), 2025419,056
Balancing authority codeMISO

Solar arrays

Array area (acres)
1,136.6
AC capacity (MW)
150
DC capacity (MW)
312.5
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2024

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Entergy Arkansas LLC Operator EIA-860M
Driver Solar, LLC Owner 100.0% 31 Dec 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Steel River Solar Phase 1 Under construction Solar + storage 13.5 km 750
Steel River Solar Phase 2 Under construction Solar + storage 13.5 km 750
Steel River Solar Phase 3 Under construction Solar + storage 13.5 km 750

Sources EIA-860M

Sources

Attribution