Drop 1
Power plant · Hydro
Key facts
Power plant · Hydroran 18% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1984
- Net generation, 2025
- 9,013 MWh
- Grid
- 35 kV to Imperial Irrigation District (IID)
- Location
- Imperial County, California
- Operated by
- Imperial Irrigation DistrictSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 9,013
MWh - Fuel burned, 2025
- 30,818
MMBtu - Capacity factor, 2025
- 18.1
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 9,013 | 30,818 | 18.1% | — |
| 2024 | 7,797 | 26,770 | 15.6% | — |
| 2023 | 5,378 | 18,439 | 10.8% | — |
| 2022 | 6,541 | 22,317 | 13.1% | — |
| 2021 | 10,448 | 92,401 | 20.9% | — |
| 2020 | 12,235 | 107,264 | 24.4% | — |
| 2019 | 8,242 | 73,395 | 16.5% | — |
| 2018 | 1,664 | 15,149 | 3.3% | — |
| 2017 | 6,732 | 62,022 | 13.5% | — |
| 2016 | 12,398 | 114,458 | 24.8% | — |
| 2015 | 16,954 | 157,995 | 34.0% | — |
| 2014 | 16,396 | 155,925 | 32.8% | — |
| 2013 | 18,851 | 179,856 | 37.8% | — |
| 2012 | 21,123 | 201,006 | 42.2% | — |
| 2011 | 19,753 | 191,919 | 39.6% | — |
| 2010 | 19,642 | 191,628 | 39.3% | — |
| 2009 | 0 | 0 | — | — |
| 2008 | 13,667 | 134,674 | 27.3% | — |
| 2007 | 19,548 | 193,212 | 39.1% | — |
| 2006 | 20,691 | 205,231 | 41.4% | — |
| 2005 | 17,182 | 171,803 | 34.4% | — |
| 2004 | 19,243 | 192,853 | 38.4% | — |
| 2003 | 20,615 | 211,118 | 41.3% | — |
| 2002 | 20,217 | 205,668 | 40.5% | — |
| 2001 | 16,342 | 168,862 | 32.7% | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.
Sources
2 sourcesSources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)