Show on map
Dry Bridge Storage — Power plant · Storage · Dominion Energy Inc.Skyward Holdings LLC — Filed · Large load · VA · 5.2 mi awayFIRST HEALTH SERVICES CORPORATION — Built · Large load · VA · 12.6 mi awayCapital One Services Incorporated — Built · Large load · VA · 13.7 mi away
  • Storage
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Dry Bridge Storage

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2023
Net generation, 2025
-1,681 MWh
Grid
34 kV to Virginia Electric & Power Co (PJM)
Location
Chesterfield County, Virginia
Operated by
Dominion Energy Inc.SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
3 years since 2023
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
34.50
Transmission owner
Virginia Electric & Power Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-1,681
Balancing authority codePJM
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -1681.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Skyward Holdings LLC Filed Large load 5.2 mi
FIRST HEALTH SERVICES CORPORATION Built Large load 12.6 mi
Capital One Services Incorporated Built Large load 13.7 mi

Sources Virginia DEQ · EPA ICIS-Air

Sources

  • Virginia DEQOpen license · retrieved Nov 4, 2026Source: Virginia Department of Environmental Quality
  • EPA ICIS-AirOpen license · retrieved Nov 8, 2026

Attribution