Show on map
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Stage not stated
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Loads
- In development
- Under construction
- Operating
- Stage not stated
- Size not stated
DS Containers: location and 17 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
DS Containers
Power plant · Solar
Key facts
Power plant · Solar Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2025
- Grid
- 750 kV to Commonwealth Edison Co (PJM)
- Location
- Dupage County, Illinois
- Operated by
- DS Containers LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 1 year since 2025
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Balancing authority code | PJM |
Timeline
- In service · EIA-860M
Sources
2 sourcesAround this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| 1454.07-IL 7 (Gevena data centre) Filed | Large load | 0.9 km | |
| COLOVORE LLC Built | Large load | 2.9 km | |
| ORD-02 (West Chicago data centre) Filed | Large load | 2.9 km | |
| EDGED CHICAGO LLC Built | Large load | 7.0 km | |
| CYRUSONE LLC × 2 units Unknown | Large load | 7.4 km | |
| Aurora 7-SLCHI307 Under construction | Solar | 7.9 km | 1.9 |
| MERIDIAN PARKWAY DATA CENTER OWNER LLC Built | Large load | 11.3 km | |
| CLOP CAROL STREAM IL LLC Built | Large load | 12.9 km | |
| KN216 Under construction | Solar | 15.0 km | 4.9 |
| Glendale Heights 10-SLCHI910 Under construction | Solar | 17.1 km | 1.3 |
| Addison 11-SLCHI404 Under construction | Solar | 18.8 km | 1.6 |
| ENSONO DATA CENTER Built | Large load | 20.1 km | |
| 360 TCS LLC Built | Large load | 21.1 km | |
| SV CSG Wilson School Solar Permitted | Solar | 22.0 km | 5 |
| COMPASS DATACENTERS ORD I Under construction | Large load | 23.5 km | |
| NTT Data Centers Built | Large load | 24.7 km |
Sources FAA OE/AAA · EPA ICIS-Air · EIA-860M · EPA ICIS-NPDES
Sources
- FAA OE/AAA Part 77 obstruction evaluation case archives (data-centre sites, buildings and cranes)
- EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)