Dunlap TP 1 — Power plant · Hydro · Guadalupe Blanco River AuthorityClear Springs Energy Center — Postponed · Gas, combustion turbine · TX · 549 MW · 2.1 mi awayGuadalupe Generating Station — Postponed · Gas, combustion turbine · TX · 320 MW · 5.9 mi awayCLOUDBURST DATA CENTERS — Under construction · Large load · TX · 9.0 mi away
  • Clean firm
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Dunlap TP 1

Power plant · Hydro

Key facts

Power plant · Hydroran 12% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1927
Net generation, 2025
3,686 MWh
Grid
34 kV to Guadalupe Valley Elec Coop Inc (ERCO)
Location
Guadalupe County, Texas
Operated by
Guadalupe Blanco River AuthoritySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
99 years since 1927
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
34.50
Transmission owner
Guadalupe Valley Elec Coop Inc
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 202512,576
Capacity factor, 20250.117
Net generation (MWh), 20253,686
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Clear Springs Energy Center Postponed Gas, combustion turbine 2.1 mi 549
Guadalupe Generating Station Postponed Gas, combustion turbine 5.9 mi 320
CLOUDBURST DATA CENTERS Under construction Large load 9.0 mi

Sources EIA-860M · EPA ICIS-NPDES

Sources

Attribution