Show on map
Durant — Power plant · Oil · City of Durant - (IA)
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1998
Net generation, 2025
29 MWh
Grid
12 kV, 2 kV to City of Durant - (IA) (MISO)
Location
Cedar County, Iowa
Operated by
City of Durant - (IA)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
28 years since 1998
Heat rate
10,442 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Eia status
By code
SB
Mw
4.40
Units
2
Standby mw
4.40
Status rule
majority_mw_standby
In service mw
4.40
Out of service mw
0
Fuel burned (MMBtu), 2025307
Capacity factor, 20250.001
Heat rate (Btu/kWh), 202510,442.2
Net generation (MWh), 202529.40
Balancing authority codeMISO

Retirement

Capacity retired
3 MW
Generators retired
3
Capacity still in service
4.4 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
4Petroleum Liquids0.5 MWRetiredDecember 2009
5Petroleum Liquids0.5 MWRetiredDecember 2009
6APetroleum Liquids2 MWRetiredFebruary 2018

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
12 kV, 2 kV
Transmission or distribution system owner
City of Durant - (IA)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
Transmission lines within 15 mi (4)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 6A scheduled to retire, 2 MW · EIA-860M
  • Stated Units 4, 5 scheduled to retire, 1 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 9, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source