Eagle Mountain — Power plant · Gas, steam turbine · Luminant Generation Company LLCEagle Mountain — Gas, combined cycle · TX · 853.5 MW · 0.0 km awayACS DFW Hicks Field Rd (Fort Worth data centre) — Large load · TX · 7.5 km awayCyrusOne DFW 7 — Large load · TX · 8.3 km awayDFW SPE 2 (Fort Worth data centre) — Large load · TX · 19.7 km awayFTW1 DC1 Expansion (Roanoke data centre) — Large load · TX · 22.4 km awayFTW DATA CENTER — Large load · TX · 22.5 km awayDATA CENTER PARK — Large load · TX · 22.8 km away
  • Combustion
  • Loads
  • In development
  • Under construction
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Eagle Mountain

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 0% of 2005 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1954
Net generation, 2005
24,097 MWh
Grid
345 kV, 138 kV to Oncor Electric Delivery Company LLC (ERCO)
Location
Tarrant County, Texas

Output

Net generation MWh by year, 2001 to 2005
Fuel burned MMBtu by year, 2001 to 2005
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
72 years since 1954
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeERCO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
August 2012
Capacity retired
706.1 MW
Generators retired
3
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Natural Gas Steam Turbine122.5 MWRetiredAugust 2012
2Natural Gas Steam Turbine187.5 MWRetiredAugust 2012
3Natural Gas Steam Turbine396.1 MWRetiredAugust 2012

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
345 kV, 138 kV
Transmission or distribution system owner
Oncor Electric Delivery Company LLC
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

3 companies4
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Luminant Generation Company LLC Operator EIA-860M
Eagle Mountain Power Company LLC Owner 100.0% 31 Dec 2025 EIA-860
Luminant Gen Co LLC Fin Holding Owner 100.0% 31 Dec 2025 EIA-860
Luminant Generation Company LLC Owner 100.0% 31 Dec 2025 EIA-860

Timeline

  • Stated Units 1, 2, 3 scheduled to retire, 706.1 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · OpenStreetMap · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

© OpenStreetMap contributors

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Eagle Mountain Postponed Gas, combined cycle 0.0 km 853.5
ACS DFW Hicks Field Rd (Fort Worth data centre) Filed Large load 7.5 km
CyrusOne DFW 7 Filed Large load 8.3 km
DFW SPE 2 (Fort Worth data centre) Filed Large load 19.7 km
FTW1 DC1 Expansion (Roanoke data centre) Filed Large load 22.4 km
FTW DATA CENTER Under construction Large load 22.5 km
DATA CENTER PARK Built Large load 22.8 km