Show on map
Eagle Point - Deptford 230 kV — Transmission lineDeptford Solar One — Postponed · Solar · NJ · 3 MW · 3.8 mi awayEQUINIX — Large load · PA · 6.3 mi awayCROSS CONNECT SOLUTIONS — Built · Large load · PA · 6.3 mi away365 DATA CENTERS — Built · Large load · PA · 6.5 mi awayH5 DATA CENTERS — Built · Large load · PA · 6.5 mi awayPettinos Solar — Postponed · Solar · NJ · 1.2 MW · 12.8 mi away
  • Loads
  • Operating
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Eagle Point - Deptford 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NJ
Owner (as stated)
Public Service Electric Gas

Details

Who’s behind it

Owner
Public Service Electric Gas

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
1
Substations at the ends (as the source names them)
Eagle Point to Deptford
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itpublic service electric gas
HIFLD line ID131898
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Deptford Solar One Postponed Solar 3.8 mi 3
EQUINIX Unknown Large load 6.3 mi
CROSS CONNECT SOLUTIONS Built Large load 6.3 mi
365 DATA CENTERS Built Large load 6.5 mi
H5 DATA CENTERS Built Large load 6.5 mi
Pettinos Solar Postponed Solar 12.8 mi 1.2

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution