Show on map
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Eagle Rock - Sylmar West 230 kV: route and 15 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Eagle Rock - Sylmar West 230 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 230 kV
- States crossed
- US-CA
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Mapped route length (miles)
- 26
- Substations at the ends (as the source names them)
- Eagle Rock to Sylmar West
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| HIFLD line ID | 311297 |
| Voltage class | 220-287 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Scholl Canyon Under construction | Biomass | 0.3 mi | 12 |
| Foothill Solar Project Postponed | Solar | 1.1 mi | 1.1 |
| Van Norman Bypass Solar Project Postponed | Solar | 1.4 mi | 2 |
| Glenarm BESS Plant Filed | Storage | 2.6 mi | 25 |
| California Institute of Technology Postponed | Gas, combined cycle | 3.5 mi | 16.5 |
| AB Van Nuys Announced | Solar | 6.1 mi | 1.6 |
| 20525 Nordhoff PV (North) Under construction | Solar | 7.4 mi | 1.9 |
| Six Flags Magic Mountain Under construction | Solar + storage | 8.7 mi | 12 |
| LATTC South Campus Solar Postponed | Solar | 9.5 mi | 1.1 |
| PRIME DATA CENTER VERNON Built | Large load | 10.6 mi | |
| Bandini - SLLAX710 Under construction | Solar | 11.8 mi | 1.3 |
| CPA 3777 Workman Postponed | Solar | 12.2 mi | 1.9 |
| Homestead Energy Storage LLC Postponed | Storage | 12.6 mi | 14 |
| Gabriel Under construction | Storage | 12.6 mi | 400 |
| Humidor Storage I Contracted | Storage | 14.9 mi | 300 |
Sources EIA-860M · EPA ICIS-NPDES · CAISO