Show on map
Glenarm BESS PlantCalifornia Institute of Technology — Postponed · Gas, combined cycle · CA · 16.5 MW · 1.5 mi awayScholl Canyon — Under construction · Biomass · CA · 12 MW · 3.3 mi awayLATTC South Campus Solar — Postponed · Solar · CA · 1.1 MW · 9.6 mi awayCPA 3777 Workman — Postponed · Solar · CA · 1.9 MW · 9.6 mi awayPRIME DATA CENTER VERNON — Built · Large load · CA · 9.9 mi awayBandini - SLLAX710 — Under construction · Solar · CA · 1.3 MW · 10.0 mi awayGabriel — Under construction · Storage · CA · 400 MW · 10.2 mi awayMarici — Under construction · Storage · CA · 400 MW · 14.2 mi away
  • Wind & solar
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Glenarm BESS Plant

Storage

Capacity
Capacity: sourceEIA-860M · Open licenseMW
In-service date
(stated)
Location
Los Angeles County, California

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Storage source: “Batteries”
EIA plant
69024 generator GLNB1

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as filed in EIA-860M (source status: “(L) Regulatory approvals pending. Not under construction”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
California Institute of Technology Postponed Gas, combined cycle 1.5 mi 16.5
Scholl Canyon Under construction Biomass 3.3 mi 12
LATTC South Campus Solar Postponed Solar 9.6 mi 1.1
CPA 3777 Workman Postponed Solar 9.6 mi 1.9
PRIME DATA CENTER VERNON Built Large load 9.9 mi
Bandini - SLLAX710 Under construction Solar 10.0 mi 1.3
Gabriel Under construction Storage 10.2 mi 400
Marici Under construction Storage 14.2 mi 400

Sources EIA-860M · EPA ICIS-NPDES · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • CAISOOpen license, with credit · retrieved Nov 16, 2026Source: California ISO

Attribution