East Campus Utility Plant

Power plant · Oil

Key facts

Power plant · Oilran 1% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2006
Net generation, 2025
500 MWh
Grid
138 kV to Duke Energy Ohio Inc (PJM)
Location
Hamilton County, Ohio
Operated by
University of CincinnatiSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2025
500MWh
Fuel burned, 2025
4,830MMBtu
Capacity factor, 2025
0.9%
Heat rate, 2025
9,664Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
2026 (8 of 12 months)4854,882—10,064
20255004,8300.9%9,664
20241471,5120.3%10,286
20232492,8050.5%11,269
20221982,1770.4%10,997
20211231,3080.2%10,593
2020525650.1%10,878
20191522,6490.3%17,439
20182552,5650.5%10,067
20171472,2180.3%15,088
20161371,0280.3%7,493
20151021,1020.2%10,812
2014747840.1%10,526
2013155185,7600.3%—
201210524,7230.2%—
20111,094314,9152.1%—
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)