Show on map
East Grande 115 kV line — Transmission lineSan Francisco Intl Airport Ct Project — Postponed · Gas, combustion turbine · CA · 48 MW · 1.2 mi awaySan Francisco Electric Reliability Proj — Withdrawn · Gas, combustion turbine · CA · 151.5 MW · 9.1 mi awayAmeresco Ox Mountain — Filed · Biomass · CA · 3 MW · 9.5 mi awayDynegy Oakland Power Plant — Announced · Storage · CA · 43.3 MW · 11.8 mi awaySan Leandro 10 - sleba702 — Under construction · Solar · CA · 1 MW · 12.8 mi away
  • Wind & solar
  • Storage
  • Bioenergy
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

East Grande 115 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
115 kV
States crossed
US-CA
Owner (as stated)
Pacific Gas Electric

Details

Who’s behind it

Owner
Pacific Gas Electric

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
1
Substations at the ends (as the source names them)
East Grande
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itpacific gas electric
HIFLD line ID308728
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
San Francisco Intl Airport Ct Project Postponed Gas, combustion turbine 1.2 mi 48
San Francisco Electric Reliability Proj Withdrawn Gas, combustion turbine 9.1 mi 151.5
Ameresco Ox Mountain Filed Biomass 9.5 mi 3
Dynegy Oakland Power Plant Announced Storage 11.8 mi 43.3
San Leandro 10 - sleba702 Under construction Solar 12.8 mi 1

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 20, 2026Source: California ISO

Attribution