Show on map
Edgecombe Genco Llc 230 kV line — Transmission lineCarter Solar — Postponed · Solar · NC · 5 MW · 7.9 mi awayEdgecombe Solar LLC — Under construction · Solar · NC · 75 MW · 7.9 mi awayEnfield Farm — Postponed · Solar · NC · 5 MW · 10.6 mi awaySweetleaf Solar LLC — Permitted · Solar · NC · 93 MW · 12.7 mi awayClayton Solar — Postponed · Solar · NC · 5 MW · 13.5 mi awayHalifax County Solar — Under construction · Solar · NC · 80 MW · 14.9 mi away
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Edgecombe Genco Llc 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NC
Owner (as stated)
Duke Energy Progress

Details

Who’s behind it

Owner
Duke Energy Progress

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
1
Substations at the ends (as the source names them)
Edgecombe Genco Llc
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduke energy progress
HIFLD line ID179064
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Carter Solar Postponed Solar 7.9 mi 5
Edgecombe Solar LLC Under construction Solar 7.9 mi 75
Enfield Farm Postponed Solar 10.6 mi 5
Sweetleaf Solar LLC Permitted Solar 12.7 mi 93
Clayton Solar Postponed Solar 13.5 mi 5
Halifax County Solar Under construction Solar 14.9 mi 80

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution