Show on map
Edwards - East Kewanee 138 kV — Transmission linePayton — Postponed · Solar · IL · 70 MW · 0.0 mi awayCincinnati CSG 1 LLC — Under construction · Solar · IL · 5 MW · 5.0 mi awayCincinnati CSG 2 LLC — Under construction · Solar · IL · 5 MW · 5.0 mi awayIL-Forefront Ameren-Truitt 1 — Under construction · Solar · IL · 2 MW · 5.4 mi awayIL-Forefront Ameren-Truitt 2 — Under construction · Solar · IL · 2 MW · 5.4 mi awayIL - Forefront Ameren- Route 40 — Under construction · Solar · IL · 2 MW · 6.0 mi awayCrescent Ridge II Wind Energy Project — Postponed · Wind · IL · 57.8 MW · 10.4 mi awayUSS Swank Solar — Under construction · Solar · IL · 1 MW · 10.5 mi awayGalva School — Announced · Solar · IL · 1.5 MW · 10.6 mi awayAllen CSG — Under construction · Solar · IL · 5 MW · 11.4 mi awayBungalow Solar, LLC — Under construction · Solar · IL · 5 MW · 11.6 mi away
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Edwards - East Kewanee 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-IL
Owner (as stated)
Ameren Illinois

Details

Who’s behind it

Owner
Ameren Illinois

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
54
Substations at the ends (as the source names them)
Edwards to East Kewanee
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itameren illinois
HIFLD line ID113817
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Payton Postponed Solar 0.0 mi 70
Cincinnati CSG 1 LLC Under construction Solar 5.0 mi 5
Cincinnati CSG 2 LLC Under construction Solar 5.0 mi 5
IL-Forefront Ameren-Truitt 1 Under construction Solar 5.4 mi 2
IL-Forefront Ameren-Truitt 2 Under construction Solar 5.4 mi 2
IL - Forefront Ameren- Route 40 Under construction Solar 6.0 mi 2
Crescent Ridge II Wind Energy Project Postponed Wind 10.4 mi 57.8
USS Swank Solar Under construction Solar 10.5 mi 1
Galva School Announced Solar 10.6 mi 1.5
Allen CSG Under construction Solar 11.4 mi 5
Bungalow Solar, LLC Under construction Solar 11.6 mi 5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution