Eielson AFB Central Heat & Power Plant

Power plant · Coal

Key facts

Power plant · Coalran 24% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1955
Net generation, 2025
77,129 MWh
Grid
7 kV to Golden Valley Elec Assn Inc
Location
Fairbanks North Star County, Alaska
Operated by
U S Air Force-Eielson AFBSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Coal
  • Oil
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Coal source: “Conventional Steam Coal”
Age
71 years since 1955
Unused energy
238 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Eia status
By code
OP
Mw
30
Units
4
SB
Mw
6
Units
4
Standby mw
6
Status rule
some_units_retired
In service mw
36
Out of service mw
0
Fuel burned (MMBtu), 20252,812,034
Capacity factor, 20250.245
Net generation (MWh), 202577,129
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 36458.8 outside 5000-30000 Btu/kWh

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
5 MW
Generators retired
2
Capacity still in service
36 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
TG1Conventional Steam Coal2.5 MWRetiredMay 2022
TG2Conventional Steam Coal2.5 MWRetiredMay 2022

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
7 kV
Transmission or distribution system owner
Golden Valley Elec Assn Inc
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units TG1, TG2 scheduled to retire, 5 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution