Show on map
- Wind & solar
- In development
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- In development
- Operating
Eight Point Wind: location and 3 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Eight Point Wind
Power plant · Wind
Key facts
Power plant · Windran 30% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2023
- Net generation, 2025
- 267,393 MWh
- Grid
- 115 kV to New York State Elec & Gas Corp (NYIS)
- Location
- Steuben County, New York
- Operated by
- Eight Point Wind, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Wind source: “Onshore Wind Turbine”
- Age
- 3 years since 2023
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 912,343 |
| Capacity factor, 2025 | 0.302 |
| Net generation (MWh), 2025 | 267,393 |
| Balancing authority code | NYIS |
Wind turbines
Wind turbines
USGS maps these turbines around a center 2.0 mi from the point this page maps the plant at; the nearest turbine is 0.6 mi from that point.
- Turbines
- 24
- Turbine capacity (MW)
- 111
- Turbine models
- 7 GE Wind GE2.5-127 and 17 GE Wind GE5.5-158
- Hub height (m)
- 90–117
- Rotor diameter (m)
- 127–158
- Year online
- 2023
Source U.S. Wind Turbine Database
Source
- U.S. Wind Turbine DatabaseMap services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
Timeline
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- U.S. Wind Turbine DatabaseMap services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Canisteo Wind Farm Postponed | Wind | 6.1 mi | 290.7 |
| Alfred Oaks Solar, LLC × 2 units Announced | Solar | 9.7 mi | 135.2 |
Sources EIA-860M