Show on map
Elkton — Power plant · Gas, steam turbine · MERCK & CO INCElkton unit GEN9 — Postponed · Solar · VA · 2.5 MW · 0.0 mi awaySun Ridge Solar — Under construction · Solar · VA · 50 MW · 6.9 mi awayTwins Solar — Postponed · Solar + storage · VA · 300 MW · 9.2 mi awayANTHEM CDC 3 — Built · Large load · VA · 12.2 mi awayROCKINGHAM MEMORIAL HOSPITAL DATA CENTER — Built · Large load · VA · 12.9 mi away
  • Combustion
  • Wind & solar
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 6% of 2025 Out of service
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1982
Net generation, 2025
7,399 MWh
Grid
13 kV, 2 kV to Virginia Electric & Power Co (PJM)
Location
Rockingham County, Virginia
Operated by
Merck & CO IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Owner
Merck & CO IncSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
44 years since 1982
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110053173659
Subparts reported
C
NAICS code
325412
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1003595
Eia status
By code
OP
Mw
6.40
Units
4
OS
Mw
7.60
Units
2
Standby mw
0
Status rule
majority_mw_out_of_service
In service mw
14
Out of service mw
7.60
Fuel burned (MMBtu), 2025730,742
Capacity factor, 20250.060
Net generation (MWh), 20257,399
Balancing authority codePJM
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 98762.3 outside 5000-30000 Btu/kWh

Retirement

Capacity retired
2.3 MW
Generators retired
3
Capacity still in service
14 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN2Petroleum Liquids0.9 MWRetiredOctober 2021
GEN3Natural Gas Internal Combustion Engine1.1 MWRetiredOctober 2022
GEN4Natural Gas Internal Combustion Engine0.3 MWRetiredDecember 2023
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Internal Combustion Engine1.4 MW
Petroleum Liquids0.9 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
13 kV, 2 kV
Transmission or distribution system owner
Virginia Electric & Power Co
Balancing authority
PJM Interconnection, LLC
NERC region
SERC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit GEN4 scheduled to retire, 0.3 MW · EIA-860M
  • Stated Unit GEN3 scheduled to retire, 1.1 MW · EIA-860M
  • Stated Unit GEN2 scheduled to retire, 0.9 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Elkton unit GEN9 Postponed Solar 0.0 mi 2.5
Sun Ridge Solar Under construction Solar 6.9 mi 50
Twins Solar Postponed Solar + storage 9.2 mi 300
ANTHEM CDC 3 Built Large load 12.2 mi
ROCKINGHAM MEMORIAL HOSPITAL DATA CENTER Built Large load 12.9 mi

Sources EIA-860M · Virginia DEQ · EPA ICIS-Air

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • Virginia DEQOpen license · retrieved Nov 4, 2026Source: Virginia Department of Environmental Quality
  • EPA ICIS-AirOpen license · retrieved Nov 8, 2026

Attribution