Elmwood Park Power LLC — Power plant · Gas, combined cycle · Elmwood Park Power LLCCLIFTON DATA CENTER — Built · Large load · NJ · 5.0 mi awayDLR Totowa Building A (Totowa data centre) — Filed · Large load · NJ · 5.3 mi awayEQUINIX LLC — Built · Large load · NJ · 9.2 mi awayEQUINIX — Built · Large load · NJ · 9.4 mi awayCORESITE NY4 DATA CENTER — Under construction · Large load · NJ · 9.8 mi awayNJ TRANSITGRID — Postponed · Gas, combustion turbine · NJ · 136.1 MW · 11.1 mi awayCYXTERA - NJ2X — Built · Large load · NJ · 11.4 mi awayDATA CENTER BUILDING EXPANSION — Under construction · Large load · NY · 12.0 mi awayNYSE DATA CENTER CRANE — Filed · Large load · NJ · 12.1 mi awayRAR DEVELOPMENT ASSOCIATES — Built · Large load · NJ · 12.1 mi awayRAR DEVELOPMENT ASSOCIATES — Built · Large load · NJ · 12.2 mi awayLincoln Medical and Mental Health Center — Under construction · Oil · NY · 1 MW · 12.4 mi awayLobelia 4452 Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 12.8 mi awayLobelia Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 12.8 mi awayORANGETOWN DATA CENTER — Built · Large load · NY · 12.9 mi awayNew York University Central Plant — Under construction · Gas, combined cycle · NY · 5.5 MW · 13.4 mi awayRavenswood — Postponed · Storage · NY · 316 MW · 14.0 mi awayWintergreen C Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 14.1 mi awayWintergreen B Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 14.1 mi awayWintergreen D Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 14.1 mi awayWintergreen Clean Energy, LLC — Under construction · Storage · NY · 4.9 MW · 14.1 mi awayAstoria Gas Turbines — Postponed · Gas, combustion turbine · NY · 431 MW · 14.4 mi awayCDIL DATA CENTRE USA LLC — Built · Large load · NY · 14.4 mi awayAB Newark Solar — Postponed · Solar · NJ · 5.6 MW · 14.7 mi away
  • Combustion
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Elmwood Park Power LLC

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycle Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1989
Net generation, 2021
0 MWh
Location
Bergen County, New Jersey

Output

Net generation MWh by year, 2001 to 2021
Fuel burned MMBtu by year, 2001 to 2021
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
37 years since 1989
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Riverstone Management Group LLC
Share pct
100
Gem entity id
E100002016525
Unit ids
G100000401723
Location id
L100000401581
Eia plant ids
50852
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110004206680
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1007297
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
March 2021
Capacity retired
89.5 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Natural Gas Fired Combined Cycle66.6 MWRetiredMarch 2021
GEN2Natural Gas Fired Combined Cycle22.9 MWRetiredMarch 2021

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
PJM
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
TALEN ENERGY CORP Owner 100.0% Dec 31, 2023 EPA GHGRP
Elmwood Park Power LLC Operator EIA-860M

Timeline

  • Stated Units GEN1, GEN2 scheduled to retire, 89.5 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CLIFTON DATA CENTER Built Large load 5.0 mi
DLR Totowa Building A (Totowa data centre) Filed Large load 5.3 mi
EQUINIX LLC Built Large load 9.2 mi
EQUINIX Built Large load 9.4 mi
CORESITE NY4 DATA CENTER Under construction Large load 9.8 mi
NJ TRANSITGRID Postponed Gas, combustion turbine 11.1 mi 136.1
CYXTERA - NJ2X Built Large load 11.4 mi
DATA CENTER BUILDING EXPANSION Under construction Large load 12.0 mi
NYSE DATA CENTER CRANE Filed Large load 12.1 mi
RAR DEVELOPMENT ASSOCIATES × 2 units Built Large load 12.1 mi
Lincoln Medical and Mental Health Center Under construction Oil 12.4 mi 1
Lobelia 4452 Clean Energy LLC Under construction Storage 12.8 mi 4.9
Lobelia Clean Energy LLC Under construction Storage 12.8 mi 4.9
ORANGETOWN DATA CENTER Built Large load 12.9 mi
New York University Central Plant Under construction Gas, combined cycle 13.4 mi 5.5
Ravenswood Postponed Storage 14.0 mi 316
Wintergreen C Clean Energy LLC Under construction Storage 14.1 mi 4.9
Wintergreen B Clean Energy LLC Under construction Storage 14.1 mi 4.9
Wintergreen D Clean Energy LLC Under construction Storage 14.1 mi 4.9
Wintergreen Clean Energy, LLC Under construction Storage 14.1 mi 4.9
Astoria Gas Turbines Postponed Gas, combustion turbine 14.4 mi 431
CDIL DATA CENTRE USA LLC Built Large load 14.4 mi
AB Newark Solar Postponed Solar 14.7 mi 5.6

Sources EPA ICIS-Air · FAA OE/AAA · EPA ICIS-NPDES · EIA-860M

Sources

Attribution