Show on map
Emerald Grove — Power plant · Solar · Luminant Generation Company LLCMorada del Sol, LLC — Postponed · Solar · TX · 247 MW · 6.5 mi awayMendoza Trail BESS — Under construction · Storage · TX · 200 MW · 7.4 mi awayRE Maplewood — Postponed · Solar · TX · 300 MW · 10.1 mi awayCrane 2 BESS 2 — Postponed · Storage · TX · 150 MW · 10.2 mi awayUpton BESS 2 — Postponed · Storage · TX · 150 MW · 11.3 mi away
  • Wind & solar
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Emerald Grove

Power plant · Solar

Key facts

Power plant · Solarran 27% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2023
Net generation, 2025
256,324 MWh
Grid
138 kV to Lower Colorado River Authority (ERCO)
Location
Pecos County, Texas
Operated by
Luminant Generation Company LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2022 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
3 years since 2023
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000805289
Location id
L100000804594
Eia plant ids
63233
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
Lower Colorado River Authority
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 2025874,576
Capacity factor, 20250.271
Net generation (MWh), 2025256,324
Balancing authority codeERCO

Solar arrays

Array area (acres)
535.3
AC capacity (MW)
108
DC capacity (MW)
108
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2019

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Morada del Sol, LLC Postponed Solar 6.5 mi 247
Mendoza Trail BESS Under construction Storage 7.4 mi 200
RE Maplewood Postponed Solar 10.1 mi 300
Crane 2 BESS 2 Postponed Storage 10.2 mi 150
Upton BESS 2 Postponed Storage 11.3 mi 150

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution