Show on map
Emmonak — Power plant · Oil · Alaska Village Elec Coop, IncAlakanuk — Postponed · Oil · AK · 0.5 MW · 7.6 mi away
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 47% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1995
Net generation, 2025
5,769 MWh
Grid
12 kV to Alaska Village Elec Coop, Inc
Location
Kusilvak County, Alaska
Operated by
Alaska Village Elec Coop, IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
31 years since 1995
Unused energy
6 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
9,035 Btu/kWh 2025
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 202552,122
Capacity factor, 20250.470
Heat rate (Btu/kWh), 20259,034.8
Net generation (MWh), 20255,769

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
3.4 MW
Generators retired
6
Capacity still in service
1.4 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
4Petroleum Liquids0.3 MWRetiredApril 2005
5Petroleum Liquids0.5 MWRetiredApril 2005
2Petroleum Liquids0.3 MWRetiredAugust 2011
5aPetroleum Liquids0.5 MWRetiredJune 2016
2APetroleum Liquids0.5 MWRetiredDecember 2024
5BPetroleum Liquids1.3 MWRetiredDecember 2024

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
12 kV
Transmission or distribution system owner
Alaska Village Elec Coop, Inc
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 2A, 5B scheduled to retire, 1.8 MW · EIA-860M
  • Stated Unit 5a scheduled to retire, 0.5 MW · EIA-860M
  • Stated Unit 2 scheduled to retire, 0.3 MW · EIA-860M
  • Stated Units 4, 5 scheduled to retire, 0.8 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Alakanuk Postponed Oil 7.6 mi 0.5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution