Show on map
Empire — Power plant · Geothermal · USG Nevada LLC
  • Clean firm
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Geothermal

Key facts

Power plant · Geothermalran 46% of 2011 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1987
Net generation, 2011
19,429 MWh
Grid
69 kV to Sierra Pacific Power Co (NEVP)
Location
Washoe County, Nevada
Operated by
USG Nevada LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2011

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Geothermal source: “Geothermal”
Age
39 years since 1987
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeNEVP

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2011
Capacity retired
4.8 MW
Generators retired
4
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
OE11Geothermal1.2 MWRetiredDecember 2011
OE12Geothermal1.2 MWRetiredDecember 2011
OE13Geothermal1.2 MWRetiredDecember 2011
OE14Geothermal1.2 MWRetiredDecember 2011

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
Sierra Pacific Power Co
Balancing authority
Nevada Power Company
NERC region
WECC
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units OE11, OE12, OE13, OE14 scheduled to retire, 4.8 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

View at source