Show on map
Eno - Pleasant Garden 230 kV — Transmission lineBeth Solar — Postponed · Solar · NC · 5 MW · 0.1 mi awayCharlie Solar — Postponed · Solar · NC · 4.5 MW · 0.2 mi awayBinks Solar — Postponed · Solar · NC · 4 MW · 2.1 mi awayClimax Solar — Postponed · Solar · NC · 5 MW · 4.5 mi awayWest River Solar, LLC — Under construction · Solar · NC · 40 MW · 5.2 mi awayDUKE UNIVERSITY GPU DATA CENTER — Under construction · Large load · NC · 5.7 mi awayBig Boy Solar — Postponed · Solar · NC · 3 MW · 7.6 mi awayUniv of NC Chapel Hill Cogen Facility — Postponed · Coal · NC · 24 MW · 8.5 mi awayPike Road Solar — Postponed · Solar · NC · 5 MW · 9.4 mi awayQuaker Creek Farm Solar — Under construction · Solar · NC · 34.9 MW · 10.8 mi awayLotus Solar — Postponed · Solar · NC · 4 MW · 11.5 mi awayACEHOST RALEIGH - DURHAM DATA CENTER — Built · Large load · NC · 13.8 mi awayFIDELITY REAL ESTATE CO.- FIDELITY MORRISVILLE DATA CENTER — Built · Large load · NC · 14.3 mi awayOsceola Solar, LLC — Postponed · Solar · NC · 5 MW · 14.9 mi away
  • Wind & solar
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Eno - Pleasant Garden 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NC

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
43
Substations at the ends (as the source names them)
Eno to Pleasant Garden
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID125178
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Beth Solar Postponed Solar 0.1 mi 5
Charlie Solar Postponed Solar 0.2 mi 4.5
Binks Solar Postponed Solar 2.1 mi 4
Climax Solar Postponed Solar 4.5 mi 5
West River Solar, LLC Under construction Solar 5.2 mi 40
DUKE UNIVERSITY GPU DATA CENTER Under construction Large load 5.7 mi
Big Boy Solar Postponed Solar 7.6 mi 3
Univ of NC Chapel Hill Cogen Facility Postponed Coal 8.5 mi 24
Pike Road Solar Postponed Solar 9.4 mi 5
Quaker Creek Farm Solar Under construction Solar 10.8 mi 34.9
Lotus Solar Postponed Solar 11.5 mi 4
ACEHOST RALEIGH - DURHAM DATA CENTER Built Large load 13.8 mi
FIDELITY REAL ESTATE CO.- FIDELITY MORRISVILLE DATA CENTER Built Large load 14.3 mi
Osceola Solar, LLC Postponed Solar 14.9 mi 5

Sources EIA-860M · EPA ICIS-NPDES · EPA ICIS-Air

Sources

Attribution