Show on map
- Wind & solar
- Loads
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Loads
- Under construction
- Operating
- Size not stated
- Other infrastructure
Eno - Pleasant Garden 230 kV: route and 14 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Eno - Pleasant Garden 230 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 230 kV
- States crossed
- US-NC
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Mapped route length (miles)
- 43
- Substations at the ends (as the source names them)
- Eno to Pleasant Garden
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| HIFLD line ID | 125178 |
| Voltage class | 220-287 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Beth Solar Postponed | Solar | 0.1 mi | 5 |
| Charlie Solar Postponed | Solar | 0.2 mi | 4.5 |
| Binks Solar Postponed | Solar | 2.1 mi | 4 |
| Climax Solar Postponed | Solar | 4.5 mi | 5 |
| West River Solar, LLC Under construction | Solar | 5.2 mi | 40 |
| DUKE UNIVERSITY GPU DATA CENTER Under construction | Large load | 5.7 mi | |
| Big Boy Solar Postponed | Solar | 7.6 mi | 3 |
| Univ of NC Chapel Hill Cogen Facility Postponed | Coal | 8.5 mi | 24 |
| Pike Road Solar Postponed | Solar | 9.4 mi | 5 |
| Quaker Creek Farm Solar Under construction | Solar | 10.8 mi | 34.9 |
| Lotus Solar Postponed | Solar | 11.5 mi | 4 |
| ACEHOST RALEIGH - DURHAM DATA CENTER Built | Large load | 13.8 mi | |
| FIDELITY REAL ESTATE CO.- FIDELITY MORRISVILLE DATA CENTER Built | Large load | 14.3 mi | |
| Osceola Solar, LLC Postponed | Solar | 14.9 mi | 5 |
Sources EIA-860M · EPA ICIS-NPDES · EPA ICIS-Air