Show on map
West River Solar, LLCBig Boy Solar — Postponed · Solar · NC · 3 MW · 2.4 mi awayCharlie Solar — Postponed · Solar · NC · 4.5 MW · 5.3 mi awayBeth Solar — Postponed · Solar · NC · 5 MW · 5.3 mi awayLotus Solar — Postponed · Solar · NC · 4 MW · 8.7 mi awayClimax Solar — Postponed · Solar · NC · 5 MW · 11.0 mi awayOsceola Solar, LLC — Postponed · Solar · NC · 5 MW · 11.8 mi awayKatherine Solar — Postponed · Solar · NC · 5 MW · 13.8 mi away
  • Wind & solar
  • Under construction
  • 10 · 100 · 1,000 MW

West River Solar, LLC

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Interconnection queue
Duke Energy Carolinas (DUK)
In-service date
(stated)
Location
Guilford County, North Carolina

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
EIA plant
63806 generator PGR28

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as under construction in EIA-860M (source status: “(U) Under construction, less than or equal to 50 percent complete”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Big Boy Solar Postponed Solar 2.4 mi 3
Charlie Solar Postponed Solar 5.3 mi 4.5
Beth Solar Postponed Solar 5.3 mi 5
Lotus Solar Postponed Solar 8.7 mi 4
Climax Solar Postponed Solar 11.0 mi 5
Osceola Solar, LLC Postponed Solar 11.8 mi 5
Katherine Solar Postponed Solar 13.8 mi 5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution