Eolos Wind Energy Research Field Station
Power plant · Wind
Key facts
Power plant · Windran 9% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2011
- Net generation, 2025
- 1,950 MWh
- Grid
- 34 kV to Northern States Power Co - Minnesota (MISO)
- Location
- Dakota County, Minnesota
- Operated by
- Regents of the University of MinnesotaSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Technology
- Wind source: “Onshore Wind Turbine”
- Age
- 15 years since 2011
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 6,653 |
| Capacity factor, 2025 | 0.089 |
| Net generation (MWh), 2025 | 1,950 |
| Balancing authority code | MISO |
Wind turbines
- Turbines
- 1
- Turbine capacity (MW)
- 2.5
- Turbine models
- 1 Clipper C96
- Hub height (m)
- 80
- Rotor diameter (m)
- 96
- Year online
- 2011
Source U.S. Wind Turbine Database
Source
- U.S. Wind Turbine DatabaseMap services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
Timeline
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- U.S. Wind Turbine DatabaseMap services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| JIMNIST LLC Built | Large load | 0.5 mi | |
| Gladiolus Solar, LLC Postponed | Solar | 1.2 mi | 1 |
| Dakota Solar Postponed | Solar | 6.6 mi | 3 |
| EAGAN 5 MW DATA CENTER Built | Large load | 7.5 mi | |
| DATABANK - EAGAN - MSP2 Built | Large load | 9.0 mi | |
| IRON GATE DATA CENTERS - EAGAN Built | Large load | 9.8 mi | |
| Black Dog Postponed | Gas, combined cycle | 11.4 mi | 760 |
Sources EPA ICIS-Air · EIA-860M