Show on map
DATABANK - EAGAN - MSP2IRON GATE DATA CENTERS - EAGAN — Built · Large load · MN · 1.1 mi awayEAGAN 5 MW DATA CENTER — Built · Large load · MN · 1.9 mi awayDakota Solar — Postponed · Solar · MN · 3 MW · 5.5 mi awayBlack Dog — Postponed · Gas, combined cycle · MN · 760 MW · 5.5 mi awayJIMNIST LLC — Built · Large load · MN · 8.4 mi awayGladiolus Solar, LLC — Postponed · Solar · MN · 1 MW · 9.9 mi awayFAIRVIEW DATA CENTER — Built · Large load · MN · 11.4 mi awaySUPERCOMPUTER LLC — Built · Large load · MN · 12.5 mi awayFIS GLOBAL — Built · Large load · MN · 13.7 mi awayBlue Lake BESS — Under construction · Storage · MN · 135.5 MW · 14.3 mi awayHB FULLER CO - DATA CENTER - ARDEN HILLS — Built · Large load · MN · 14.9 mi away
  • Storage
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Databank - Eagan - MSP2

Data center

As filed: DATABANK - EAGAN - MSP2

Kind
Data center
Location
Dakota County, Minnesota

Details

Who’s behind it

Developer
DataBank

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Data center source: “Data Center”
Capacity (MW)
Not stated
  • Selected as a data center because its industry code is NAICS 518210 (data processing and hosting). Some sites with this code are offices with a server room: 39 of 49 checked by hand were data centers. EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)

Timeline

  • Observed as built in EPA ICIS-Air (source status: “Operating”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EPA ICIS-Air

Sources

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
IRON GATE DATA CENTERS - EAGAN Built Large load 1.1 mi
EAGAN 5 MW DATA CENTER Built Large load 1.9 mi
Dakota Solar Postponed Solar 5.5 mi 3
Black Dog Postponed Gas, combined cycle 5.5 mi 760
JIMNIST LLC Built Large load 8.4 mi
Gladiolus Solar, LLC Postponed Solar 9.9 mi 1
FAIRVIEW DATA CENTER Built Large load 11.4 mi
SUPERCOMPUTER LLC Built Large load 12.5 mi
FIS GLOBAL Built Large load 13.7 mi
Blue Lake BESS Under construction Storage 14.3 mi 135.5
HB FULLER CO - DATA CENTER - ARDEN HILLS Built Large load 14.9 mi

Sources EPA ICIS-Air · EIA-860M

Sources

Attribution