Show on map
Everetts 230 kV line — Transmission lineMcCaskey Solar Farm, LLC — Postponed · Solar · NC · 2.4 MW · 1.5 mi awayTarboro Farm — Postponed · Solar · NC · 5 MW · 2.4 mi awayGreenville Farm 2 — Postponed · Solar · NC · 3 MW · 9.1 mi awayJamesville Solar — Postponed · Solar · NC · 5 MW · 12.9 mi awayEdgecombe Solar LLC — Under construction · Solar · NC · 75 MW · 13.1 mi awayWindsor BESS — Under construction · Storage · NC · 3.9 MW · 14.7 mi away
  • Wind & solar
  • Storage
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Everetts 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NC
Owner (as stated)
Virginia Electric Power

Details

Who’s behind it

Owner
Virginia Electric Power

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
23
Substations at the ends (as the source names them)
Everetts
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itvirginia electric power
HIFLD line ID158215
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
McCaskey Solar Farm, LLC Postponed Solar 1.5 mi 2.4
Tarboro Farm Postponed Solar 2.4 mi 5
Greenville Farm 2 Postponed Solar 9.1 mi 3
Jamesville Solar Postponed Solar 12.9 mi 5
Edgecombe Solar LLC Under construction Solar 13.1 mi 75
Windsor BESS Under construction Storage 14.7 mi 3.9

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution