Show on map
Factory — Power plant · Oil · City of Springfield - (IL)CENTRAL COMPUTING FACILITY, CMS — Large load · IL · 3.2 km awaySangamon Wind Two LLC — Wind · IL · 100 MW · 19.4 km awayPrairie Energy — Coal · IL · 91 MW · 22.8 km away
  • Combustion
  • Loads
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1973
Net generation, 2025
132 MWh
Grid
69 kV to City of Springfield - (IL) (MISO)
Location
Sangamon County, Illinois
Operated by
City of Springfield - (IL)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
53 years since 1973
Unused energy
233 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
16,689 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
69
Transmission owner
City of Springfield - (IL)
Balancing authority code
MISO
Balancing authority name
Midcontinent Independent Transmission System Operator, Inc..
Fuel burned (MMBtu), 20252,203
Capacity factor, 20250.001
Heat rate (Btu/kWh), 202516,689.4
Net generation (MWh), 2025132
Balancing authority codeMISO

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
CENTRAL COMPUTING FACILITY, CMS Built Large load 3.2 km
Sangamon Wind Two LLC Postponed Wind 19.4 km 100
Prairie Energy Postponed Coal 22.8 km 91